Building 010 Poured Wall
025 Interior Braced Wall
030 Firewall Framing
040 Firewall Insulation
095 Deck Footing
100 Footing
105 Slab
110 Projection
115 Waterproofing/Draintile
120 Foundation
125 Veneer
130 Framing
135 Above Ceiling
140 Insulation
145 Fireplace
190 Final Building
195 Other Building
Mechanical 200 Rough-in
205 Gas Piping Rough-in
210 U.G. Storage Tank
215 Gas Piping Final
290 Final Mechanical
295 Other Mechanical
Plumbing 305 Water Service
310 Sewer Service
315 Groundwork
320 Gas Piping Rough-in
325 Rough-in
330 Gas Piping Final
390 Final Plumbing
395 Other Plumbing
Electrical 400 Rough-in
405 Temporary Service
410 Groundwork
415 Above Ceiling
420 Wall
425 Service Change
430 Pool Potting
490 Final Electrical
495 Other Electrical
Fire Protection 505 Rough-in
510 Sprinkler/Hydro Flush Test
515 Exhaust Hood Suppression
520 Smoke Control System
525 Fire Underground/Hydro Flush
590 Final Fire Protection
595 Other Fire Protection
Elevator 690 Elevator/Lift
695 Other Elevator
Sign 700 Footing
790 Final Sign
795 Other Sign

Click here to go to the Automated Permit System (APS) instructions page.